Resource Type

Journal Article 714

Conference Videos 19

Year

2023 29

2022 62

2021 59

2020 48

2019 30

2018 57

2017 38

2016 48

2015 30

2014 31

2013 43

2012 30

2011 47

2010 31

2009 17

2008 26

2007 20

2006 8

2005 12

2004 15

open ︾

Keywords

Three Gorges Project 33

project management 23

evaluation 17

performance evaluation 11

Three Gorges Project ship lift 9

ship lift 8

Software-defined networking (SDN) 6

construction project 5

risk management 5

sustainable development 5

construction management 4

evaluation system 4

fuzzy comprehensive evaluation 4

index system 4

quality evaluation 4

sustainability 4

comprehensive evaluation 3

construction 3

management 3

open ︾

Search scope:

排序: Display mode:

Research on performance evaluation system of the western traffic science and technology project and preliminary

Zhao Jiehua,Kang Hourong

Strategic Study of CAE 2008, Volume 10, Issue 12,   Pages 73-78

Abstract: of research results of traffic science and technology projects and strengthening the management of projectBased on the determination of the performance evaluation implementation flow of the traffic science andtechnology projects, and standing at the post-evaluation perspectives analyzing the social and economicbenefits, this paper builds relatively perfect project evaluation criteria and establishes the systematicthe scientificalness, effectiveness and rationality of the traffic science and technology projects evaluation

Keywords: the western traffic science and technology project     performance evaluation     post-evaluation index system    

Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration

Shu-lin Zhang

Frontiers of Engineering Management 2016, Volume 3, Issue 4,   Pages 331-337 doi: 10.15302/J-FEM-2016058

Abstract: New overseas venture evaluation is key for oversea exploration of Chinese oil companies, whose credibilityThe uniqueness of new overseas venture evaluation in short assessing cycle and limited data make projectProject management includes human resource allocation, quality control and effective communication.evaluation norms for overseas oil & gas exploration, regulations for new overseas venture evaluationand seismic interpretation methodology and procedure for new overseas venture evaluation.

Keywords: new overseas venture evaluation     exploration     project management     quality management     assessing system    

Study on systematically evaluating models for project performance and improvement

Li Zhenyou,He Jishan

Strategic Study of CAE 2011, Volume 13, Issue 8,   Pages 10-14

Abstract:

Project systematical evaluation is actually the important and necessarytool for the project-driven company to continuously improve their project performance and efficiencyexcluding the complex methodologies and means that were prone to cause misunderstanding in the evaluationThe improved model has proposed more consistent evaluating criteria that are more practical in evaluationactivities of project knowledge management for project-driven companies.

Keywords: project evaluation     project management     PE model     project knowledge management    

Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering

Bing WANG, Qingbin CUI, Shuibo ZHANG

Frontiers of Engineering Management 2019, Volume 6, Issue 2,   Pages 239-248 doi: 10.1007/s42524-019-0018-3

Abstract: increasingly motivating the private sector to participate in infrastructure development using alternative projectdesigning contracts, governments usually offer incentives while requiring cost or time guarantee to balance projectThe New Mexico Highway 44 project, in which three warranty provision arrangements are investigated, isshow that although a ceiling clause can effectively motivate the private sector to participate in the project

Keywords: infrastructure development     contract design     contract reliability     guarantee provision     contract engineering    

Evaluation Index System and Case Study of ERP Project Implementation in China

Chen Zhixiang,Wu Junfeng

Strategic Study of CAE 2005, Volume 7, Issue 3,   Pages 35-41

Abstract: In this paper, the problem of evaluation of ERP implementing in Chinese enterprise was studied.One comprehensive evaluation index system which combines the application ability and application effectcase of ERP implementation in Chinese enterprise was studied to demonstrate the effectiveness of the evaluation

Keywords: enterprise resource planning     effect evaluation     case    

Research on Evaluating the Efficiency of the Project Financing of the Energy Service Company

Bao-zhen Zhang,Han-ding Guo,Cai-xia Yang,Lei Wang

Frontiers of Engineering Management 2016, Volume 3, Issue 3,   Pages 252-257 doi: 10.15302/J-FEM-2016044

Abstract: The financing efficiency evaluation of the ESCO (Energy Service Company) is an important approach toand reasonably evaluate the financing efficiency of the ESCO, this paper puts forward a combination evaluationSecondly, mean, Borda and Copeland are used separately for calculating the combination evaluation resultsand the circular combination method is used to ensure the coherence of evaluation results.Finally, the combination evaluation model is used to evaluate the 10 ESCO business project financing

Keywords: ESCO     project financing     financing efficiency     method set     combination evaluation    

Flexibility analysis and evaluation for joint venture of construction project contractors

Zhao Zhenyu,Yin Yin

Strategic Study of CAE 2008, Volume 10, Issue 9,   Pages 84-87

Abstract:

The environmental turbulence evaluation index and flexibility evaluationindex of joint venture (JV) were discussed, and corresponding evaluation method was proposed.

Keywords: construction project     contractor     joint venture     flexibility management    

Evaluation of stray current corrosion resistance of concrete in metro construction

YANG Shucai, YANG Xu

Frontiers of Structural and Civil Engineering 2008, Volume 2, Issue 3,   Pages 246-252 doi: 10.1007/s11709-008-0036-4

Abstract: binder ratio, and the service life of such kind of concrete meets the basic requirement of a metro project

Keywords: project     different     requirement     simulation     capability    

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 251-267 doi: 10.15302/J-FEM-2018086

Abstract: study, our aim is to detect the typical and overall schedule delay risk throughout the construction projectthe multiple-criteria decision-making (MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation

Keywords: fuzzy analytic hierarchy process comprehensive evaluation     construction project     detection of delay risk    

Performance of seven highway construction contracting methods analyzed by project size

Yuanxin ZHANG, Abdol CHINI, R. Edward MINCHIN Jr., Lourdes PTSCHELINZEW, Dev SHAH

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 240-250 doi: 10.15302/J-FEM-2018040

Abstract: To mitigate the negative aspects of DBB, several alternative contracting methods and alternative project

Keywords: alternative contracting methods     time     cost     performance evaluation    

Research on the evaluation and mechanism of socio economic benefit of highway projects

Wang Yuning,Yun Yingxia,Fan Zhiqing

Strategic Study of CAE 2012, Volume 14, Issue 10,   Pages 97-102

Abstract: Then taking Jinji highway project of Tianjin as an example, the error of system simulation tested andThus the quantification evaluation of socio economic benefit of highway project is realized and it will

Keywords: highway project     socio economic benefit     evaluation     system dynamics    

Building of Post-project Management

Yu Han,Yu-fei Li,Hu Cheng

Frontiers of Engineering Management 2014, Volume 1, Issue 4,   Pages 353-357 doi: 10.15302/J-FEM-2014051

Abstract: Traditional project management often ignores problems arising after project completion such as valueThis paper advances the concept of “post-project”, builds a framework for post-project management withPost-project refers to a project which no longer possesses normal value, because of loss after use, inability, management decisions, implementation, and evaluation.Post-project management can realize the sustainable development of project and society.

Keywords: project management     life cycle     project update     project remake     project removal     project restoration     project recycling    

Linking elements to outcomes of knowledge transfer in the project environment: Current review and future

Frontiers of Engineering Management 2022, Volume 9, Issue 2,   Pages 221-238 doi: 10.1007/s42524-022-0195-3

Abstract: A project is a specific effort to create a unique product, so it is a favorable place for knowledge creationKnowledge can be transferred inside and outside projects and their parent project-based organizations, thus affecting project performance and organizational competitiveness.They divided KT in the project environment into three levels according to the transfer scenario: Intra-project, cross-project, and cross-organizational KT.

Keywords: knowledge transfer     knowledge management     project management     project environment     literature review    

Establishment of the Comprehensive Evaluation System of Cold Stamping Die Quality

LU Xiao-chun, GUO Sheng, RUAN Feng

Frontiers of Mechanical Engineering 2006, Volume 1, Issue 1,   Pages 80-84 doi: 10.1007/s11465-005-0021-8

Abstract:

A comprehensive evaluation system of die quality, a multiplayer hierarchical amendment index systemaccording to the characteristics of cold stamping die production, an evaluation standard referring tothe technique and design rules of dies, and a scientific evaluation by using the multiplayer hierarchicaland the fuzzy comprehensive evaluation methods are presented in this paper.

Keywords: scientific evaluation     stamping     multiplayer hierarchical     technique     evaluation standard    

Improving Internationally Core Competences Based on the Capabilities of Precise and Accurate Project

Zhen-you Li,Ji-shan He,Meng-jun Wang

Frontiers of Engineering Management 2016, Volume 3, Issue 3,   Pages 231-238 doi: 10.15302/J-FEM-2016032

Abstract: Modern international project management has entered the phase of precise and accurate project managementbeen lack of explicitly unanimous definition for the capability dimensions of precise and accurate projectThe required core capabilities based on the precise and accurate project management for various ringsare involved in the project life cycle, namely, the required internationally core competences and theircomponents for the phases of project strategic planning and decision making in the early project phase

Keywords: precise and accurate project management     project strategic planning     decision-making     project supervisionand controls     project execution     value engineering    

Title Author Date Type Operation

Research on performance evaluation system of the western traffic science and technology project and preliminary

Zhao Jiehua,Kang Hourong

Journal Article

Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration

Shu-lin Zhang

Journal Article

Study on systematically evaluating models for project performance and improvement

Li Zhenyou,He Jishan

Journal Article

Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering

Bing WANG, Qingbin CUI, Shuibo ZHANG

Journal Article

Evaluation Index System and Case Study of ERP Project Implementation in China

Chen Zhixiang,Wu Junfeng

Journal Article

Research on Evaluating the Efficiency of the Project Financing of the Energy Service Company

Bao-zhen Zhang,Han-ding Guo,Cai-xia Yang,Lei Wang

Journal Article

Flexibility analysis and evaluation for joint venture of construction project contractors

Zhao Zhenyu,Yin Yin

Journal Article

Evaluation of stray current corrosion resistance of concrete in metro construction

YANG Shucai, YANG Xu

Journal Article

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

Journal Article

Performance of seven highway construction contracting methods analyzed by project size

Yuanxin ZHANG, Abdol CHINI, R. Edward MINCHIN Jr., Lourdes PTSCHELINZEW, Dev SHAH

Journal Article

Research on the evaluation and mechanism of socio economic benefit of highway projects

Wang Yuning,Yun Yingxia,Fan Zhiqing

Journal Article

Building of Post-project Management

Yu Han,Yu-fei Li,Hu Cheng

Journal Article

Linking elements to outcomes of knowledge transfer in the project environment: Current review and future

Journal Article

Establishment of the Comprehensive Evaluation System of Cold Stamping Die Quality

LU Xiao-chun, GUO Sheng, RUAN Feng

Journal Article

Improving Internationally Core Competences Based on the Capabilities of Precise and Accurate Project

Zhen-you Li,Ji-shan He,Meng-jun Wang

Journal Article